Wednesday, 21 October 2015
Team meeting
As we have just filming left to do and Aamna couldn't make it to today's lesson, Cengi and I decided to have a team meeting. Before the lesson I met up with the main model/dancer who informed me that she couldn't dance as she has cause severe injury to her back. Cengi and I have decided that in order to carry on without music vidoe and avoid this problem, the rest of the filming is going to be acting based as we do not want the dancer/main model to cause further injury to herself.
Monday, 19 October 2015
Saturday, 17 October 2015
Wednesday, 14 October 2015
Filming session 1
Today we began filming the bridge of our song. We started off with this as this was the hardest scene to film be rewuired both male and female models.
We filmed a total of 32 shots as we wanted to have a wide range of shot types and angles.
Tuesday, 6 October 2015
Sia- Eye Of The Needle Bridge Practise
Team meeting
In today's lesson we had a quick team meeting to decide what our next steps are. We got our location releases signed and now are ready to film. All that needs to be done is the main models need to sign the talent release forms. Next lesson we are looking towards creating a evaluation of the whole production plans so we utilise our time wisely.
Monday, 5 October 2015
Saturday, 3 October 2015
Location- Team Meeting
The type of location we wanted for our music video we found was not easy for us to get a hold of as all the locations we wanted to use are given for filming on commission basis. So in the team meeting we decided we will use our college theatre and Hollow ponds as two potential locations for our music video. We will still be able to create the same effect however props will be needed to get the desired look for our music video.
Story Board update
As a group we had started on the story board however, when our teacher checked the story board the feed back we received was that our story board lacked in detailed so Aamna and I took upon the task to re start the planning of the story board and include more detail. The planning has been completed, all that is left to do now is to add pictures to show a visual of the type of shots we will be using and what our model will be doing throughout the music video.
Thursday, 1 October 2015
Subscribe to:
Comments (Atom)
















































